Our zero energy off grid modern house construction update from our wonderful contractor, Ron Bernaldo! Here he explains the progress and his thoughts, as a contractor who has not worked with structural insulated panels (SIP), or a house kit like our passive solar casa ti house kit.
"Eh, I would say it doesn't take a lot of technical expertise to put the panels together but there are quite a few steps involved, so it's not a speedy process.
We got the 44' wall done, and the one 16' wall done, and the first piece around the corner... it wasn't a wonderful day weather-wise, and I had to take care of some things on another job... but all-in-all we've got one guy filling in the framing, 2 setting panels, and the most experienced carpenter following us just framing in the doors & windows.
The factory rep checked in with us... and I had some questions that they walked me through.
I prefer screws to nails or staples, so I deviated from traditional instructions on that.
I put up a 44' wall today.
Normally we have braces all over the place, and there overnight.
I went up to that wall today, and we couldn't shake it.
It's a neat design. I'm really happy with it.
The panels go together EASY. But you do have to do things as you go along, and that's what slows you down.
One more solid day could get us all the way around the perimeter.
If I can get the perimeter done in 3 days, I might do this in 7 days. (That's my goal.)
One of those interior walls will need to go up first to set the roof panel... so that will slow the perimeter/exterior down.
The only thing I'm unhappy with is the amount of material that did not come with the kit. We need material for the clerestory, for the framing of interior, etc. - so I need to account for that.
But I am still considering in my mind the framing for the extending of the roof on one side... that will eat up time.
That's about it!"
Copeland's note: The house kit is *just* the SIPs and SIP parts, of which I had been clear. I will ask him tomorrow why or what he thought would else have been included- they do come with a window and door schedule, but we are very clear about our "bare bones" - which makes it affordable and flexible for the consumer, who could then make their own decisions according to their style and budget.
There is rain in the forecast, which will certainly slow them down... and I also rescheduled the cladding delivery (it was supposed to be delivered Friday) for next Friday (they only deliver on Fridays), because of the rain. Remember, in a rural lot, you do NOT want to get a truck full o' metal modern cladding stuck in the mud!
I am really looking forward to spending the first night with our children in this house, and sharing it with our friends and family. David Day Design did a beautiful job on an affordable, passive solar house kit for Green Modern Kits.